亲,请登录 | 免费注册 | 联系客服

客服QQ:18520648
微信账号:shouxicom
电话:+8613161811826

| 手机首席

关注首席官方微信号
掌握最新最全钱币动态

联合创办 CICE/HKCS 系列钱币展销会

联合创办 CICE/HKCS 系列钱币展销会

首席收藏网 > 数据中心 > Artemide Aste > Artemide2019年4月-钱币专场

Lot:703 埃及尼罗河大坝金章 近未流通

上一件 进入专场 下一件

世界钱币>金币

EUR 10000

Artemide2019年4月-钱币专场

2019-04-27 22:00:00

2019-04-29 05:00:00

近未流通

登录查看价格

Artemide

成交

首席数据 未经授权 严禁引用

埃及尼罗河大坝金章 近未流通

World Coins Egypt. Farouk (1936-1952).. Medal for the opening of Mohamed Ali dam on the Nile. 93.42 g. 45 mm. Egypt. Farouk (1936-1952). Medal for the opening of Mohamed Ali dam on the Nile. AU. g. 93.42 mm. 45.00 RRR. Extremely rare. Few minor marks on the edge. EF.

The delta barrage is barrage-type dam that was constructed intermittently beginning in 1833 to its initial completion in 1862. Its purpose was to improve irrigation and navigation along the main Rosetta and Damietta branches of the Nile downstream of the point where they divide north of Cairo, Egypt.

At its first operation however, the structure’s foundations were found to be of such poor quality that its main irrigation purpose had to be largely abandoned for safety reasons.Despite its ignoble beginnings, initial testing and later repairs were undertaken in the 1880s following the British Occupation of Egypt.

These repairs and their continued maintenance would largely provide the barrages’ original intent. The overall effects were largely unexpected and startling. In addition to a great reduction in costs of lifting water to irrigate fields, and labor savings needed to unclog the canals from deposited silt, the cotton crop was doubled, and the costs needed to raise crops in general was cut in half. These<br /> combined factors would stimulate demand for agricultural land which saw a doubling in price and an immediate demand which could not be satisfied. In the 1930s, when the idea for a larger, higher and stronger barrage was put forward, the old barrage was leaking again and the maintenance expenses required were of such magnitude, that the building of a new barrage was determined to be more feasible. Construction of the new Mohammed Ali Barrage lasted from 1936 to 1939.

The contract, awarded through public tender, to the British firm of Messrs. McDonald Gibbs & Co. (Engineers) and was inaugurated in December 1939. Due to technological advances its foundation was built in steel piling and concrete cement encrusted several meters below the sandy base. Granite from Aswan was also used for part of the body. The project works were a great success, entailing a work force of twelve thousand and cost 2.75 million pounds. The old Delta Barrage was then abandoned, although it has been retained as a historic monument and is still used as a road bridge. Provenance: Ex The Palace Collection of Egypt, Sothebys, 1954. King Farouks collection.

*拍品信息由各家拍卖公司提供,首席数据中心刊载出于传递更多信息之目的,并不意味着赞同其观点或证实其描述。

价格参考 Price Guide